Industrial Development

Double-Cased-Well-Installation-003-1024x768
Double-Cased-Well-Installation-011-1024x768
IMG_1378-1024x768
IMG_1381-768x1024
IMG_5632-1024x765
IMG_5636-1024x765
P2130006-1024x768
P2130008-1024x768
P2130015-1024x768
Double-Cased-Well-Installation-003-1024x768
Double-Cased-Well-Installation-011-1024x768
IMG_1378-1024x768
IMG_1381-768x1024
IMG_5632-1024x765
IMG_5636-1024x765
P2130006-1024x768
P2130008-1024x768
P2130015-1024x768
previous arrow
next arrow

Services Performed

ESE was retained by a capital investment firm and developer to conduct a Phase II Environmental Site Assessment (ESA) on a maritime buoy manufacturing facility located in northwest Houston. The Phase II ESA confirmed the presence of chlorinated volatile organic compounds (VOCs) in shallow soils and groundwater at concentrations greater than Texas Commission on Environmental Quality (TCEQ) Protective Concentration Levels (PCLs). The release was the result of a leaking underground solvent storage tank. As a result of the Phase II ESA findings and on on behalf of the client, ESE enrolled the site into the TCEQ’s Voluntary Cleanup Program (VCP) and proceeded with site characterization activities in accordance with 30 Texas Administrative Code (TAC) §350 Texas Risk Reduction Program (TRRP). Upon completion of soil and groundwater plume delineation and characterization, ESE completed a Municipal Setting Designation (MSD) application, which was accepted by the City of Houston. The MSD effectively eliminated the groundwater ingestion pathway by means of institutional control. This allowed the Site to receive a Certificate of Completion from the TCEQ, upon approval of the Affected Property Assessment and Response Action Plan Plan.

Objective

ESE’s objective was to obtain a Certificate of Completion from the TCEQ’s VCP for the release of chlorinated solvents to shallow soils and groundwater, due to historical chlorinated solvent release.

Scope of Work

  • ESE conducted a Phase II ESA, which confirmed the presence of chlorinated VOCs in shallow soil and groundwater
  • Prepared an Affected Property Assessment Report and Response Action plan in accordance with 30 TAC §350 TRRP
  • Demonstrated plume stability in groundwater through quarterly groundwater monitoring and Mann-Kendall modeling
  • Completion and acceptance of a MSD application by the City of Houston
  • Provided client representation at public hearings and City Council meetings
  • Made required notices to applicable Retail Public Utilities and private well owners
  • Received a Certificate of Completion from the TCEQ’s VCP

Key Benefits to Client

  • Environmental impacts at the site were addressed through risk based corrective action strategies, which significantly reduced the cost of remediation.
  • The risk based closure strategy allowed for continual use of the Site without business interruption. The implementation of a MSD significantly reduced the schedule required to obtain regulatory closure.
  • All exposure pathways including those associated with vapor were fully evaluated and demonstrated not to be a threat to the future inhabitance of the Site, regardless of future Site use.
  • A Certificate of Completion was obtained from the TCEQ’s VCP, indemnifying future protective purchasers from the environmental liability identified at the Site. This indemnification significantly increased the marketability and fair market value of the property, which was ultimately sold to a multifamily developer.